Skip Navigation LinksRPS 205 Home > District > Construction > Kennedy Construction

 Kennedy Construction

Pool renovation work at Kennedy Middle School includes: new concrete, pumps, filter and pool equipment, new pool gutter drain and drainage system, new ceramic tile on the pool deck, fresh paint, lighting and HVAC systems. Paving work was completed at Kennedy. Additional upgrades include ener​gy-efficie​​​nt windows​ and locker room remodeling. ​

  • Slider Image

    Kennedy Pool

  • Slider Image

    Upgraded Locker Room at Kennedy

  • Slider Image

    Paving at Kennedy

To Top