Skip Navigation LinksRPS 205 Home > District > Construction > Guilford Construction

 Guilford Construction

 

​​​​​Construction is complete on a 56,000-square-foot addition that includes a field house.
The addition includes:

  • 160-meter track with three basketball courts new entrance to the school’s swimming pool weight room
  • concession stand area
  • storage space
  • athletic offices
  • LED lighting
  • Terrazzo flooring

Other renovation projects include window replacement and mechanical upgrades, including classroom temperature controls and air conditioning in the school library. ​The auditorium received​ a sound and lighting upgrade.​

  • Slider Image

    A look inside the Field House

  • Slider Image

    Auditorium

  • Slider Image

    A look inside a new classroom

  • Slider Image

    Library Upgraded

  • Slider Image

    A look inside the new library

  • Slider Image

    A look inside the field house

  • Slider Image

    An Inside look at the construction

  • Slider Image

    Field House Construction

  • Slider Image

    New Field House

  • Slider Image

    Guilford Groundbreaking

  • Slider Image

    New windows at Guilford

  • Slider Image

    New windows at Guilford

To Top